22
Eastbound from Country Club Rd. to I-287 (4.4 mi.):04 -
22
Eastbound from N. Gaston Ave. to US 1&9 (25.1 mi.):36 -
22
Eastbound from North Dr. to GSP (10.0 mi.):15 -
22
Westbound from Glenside Ave. to I-287 (12.1 mi.):17 -
22
Westbound from NJ 28 to CR 523 (6.5 mi.):07 -
22
Westbound N. Gaston Ave. to CR 523 (10.3 mi.):11
NorthCentralSouth
-
As of 7:03pm, there's a Crash on US 1 southbound South of Old Post Rd in Edison Twp. 1 left lane of 3 lanes closed.
-
As of 6:59pm, there's a Crash on NJ 440 northbound South of US 9/Garden State Parkway in Woodbridge Twp. 2 left lanes of 3 lanes closed.
-
As of 6:35pm, there are Downed wires on NJ 27 in both directions CR 529/Plainfield Av in Edison Twp. All lanes closed.
-
As of 5:06pm, there's a Crash and a Crash investigation and an Overturned vehicle on the New Jersey Turnpike - Western Spur southbound North of Southern Mixing Bowl in Newark. All lanes blocked - western spur ramp to outer roadway - traffic diverted to inner roadway.
-
As of 3:06pm, there's a Watermain break on NJ 41 southbound South of CR 626/Chapel Av in Cherry Hill Twp. 1 left lane of 3 lanes closed.
-
As of 7:12pm, there are Delays on the New Jersey Turnpike - Western Spur southbound from South of Interchange 16W - NJ 3 in Lyndhurst Twp to North of Southern Mixing Bowl in Newark. All lanes open 5 mile delay, due to volume.
-
As of 7:11pm, there are Delays on the New Jersey Turnpike - Eastern Spur southbound from Interchange 16E - NJ 3/Lincoln Tunnel in Secaucus to North of Southern Mixing Bowl in Newark. All lanes open 6 mile delay, due to volume.
-
As of 7:01pm, there are Delays at the Holland Tunnel north tunnel westbound New York Side in New York. All lanes open The travel time from the New York side is 15 minutes to New Jersey Turnpike Exit 14C and 15 minutes to New Jersey 139 at Tonnelle Circle.
-
As of 7:00pm, there are Delays at the Lincoln Tunnel south tunnel eastbound mid tunnel in Weehawken Twp. All lanes open The travel time is 20 minutes from New Jersey Turnpike Exit 16E to the New York side.
-
As of 6:41pm, there are Delays on the Garden State Parkway southbound from North of Exit 148 - John F Kennedy Dr North in Bloomfield to Exit 145 - I-280 in East Orange 2 mile delay.
-
As of 6:41pm, there are Delays on the Garden State Parkway southbound from North of Exit 142 - I-78 in Hillside Twp to South of Exit 138 - CR 509 in Kenilworth 3 mile delay.
-
As of 6:33pm, there are Delays on Pulaski Skyway northbound from Broadway to Tonnelle Circle in Jersey City. All lanes open.
-
As of 5:11pm, there are Delays on the Garden State Parkway southbound exiting at Exit 130B-A - US 1 in Woodbridge Twp.
-
As of 4:20pm, there are Delays on US 1&9/Tonnelle Avenue southbound from North of Secaucus Rd in North Bergen Twp to Manhattan Av in Jersey City. All lanes open.
-
As of 7:07pm, there's Roadwork on the New Jersey Turnpike outer roadway southbound between North of Interchange 8A - NJ 32 in South Brunswick Twp and South of Molly Pitcher Service Area in Cranbury Twp. 1 left lanes closed.
-
As of 7:04pm, there's Roadwork on the New Jersey Turnpike inner roadway northbound between North of Interchange 9 - NJ 18 and Interchange 10 - NJ 440/I-287 in Edison Twp. 1 left lanes closed.
-
As of 7:00pm, there's Construction on I-280 eastbound in the vicinity of Exit 4 - Eisenhower Pkwy/CR 609 in East Hanover Twp. Right shoulder closed until 10:00 PM.
-
As of 7:00pm, there's Construction on NJ 70 in both directions from East of NJ 41/CR 154 in Cherry Hill Twp to NJ 38 in Pennsauken Twp. 1 right lane of 2 lanes closed until 5:00 AM.
-
As of 7:00pm, there's Construction on NJ 70 in both directions from CR 607/Maple Ave to NJ 73 in Evesham Twp. 1 right lane of 2 lanes closed until 5:00 AM.
-
As of 6:06pm, there's Roadwork on the New Jersey Turnpike inner roadway northbound at Interchange 9 - NJ 18 in East Brunswick Twp. 1 ramp closed.
-
As of 5:57pm, there's Roadwork on the New Jersey Turnpike southbound in the vicinity of Interchange 3 - NJ 168 in Deptford Twp. 1 Right lane closed to traffic until 6:00 A.M.
-
As of 9:00am, there's Construction on NJ 31 northbound from North of I-295 to CR 546/Washington Crossing Pennington Rd in Hopewell Twp. 1 right lane of 2 lanes, right shoulder closed until 3:00 PM on August 01,2025.
-
As of 7:00am, there's Construction on NJ 70 eastbound from CR 673/Springdale Rd in Cherry Hill Twp to West of Cropwell Rd in Evesham Twp. 1 right lane of 2 lanes closed until 3:00 PM.
-
As of 6:00am, there's Construction on NJ 66 in both directions CR 16/Asbury Av in Neptune Twp. Right shoulder closed until 5:00 PM.
-
As of 8:01pm, there's Construction on NJ 71 in both directions Shark River Bridge in Avon-By-The-Sea. All lanes closed and detoured until 11:45 PM on September 30,2025.
-
As of 4:02pm, there's Long term road construction on US 1&9/Tonnelle Avenue in both directions South of NJ 495/NJ 3 in North Bergen Twp. All lanes shift . Due to the Amtrak Gateway ? Hudson Tunnel Project.
-
As of 2:32pm, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 9 - Atlantic City International Airport -CR 563 in Egg Harbor Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:17pm, there's Construction on the George Washington Bridge upper level westbound ramp from West 179th Street in New York. All lanes open until 11:59 PM on December 30,2025 Trucks wider than 10 ft or longer than 110 ft are prohibited.
-
As of 8:00pm, there's Construction on US 130 in both directions from North of NJ 33 in East Windsor Twp to CR 614/Dey Rd in South Brunswick Twp. 1 right lane of 2 lanes closed until 6:00 AM on August 02,2025.
-
As of 7:00am, there's Construction on NJ 47 in both directions from South of US 322/CR 641/High St in Glassboro to NJ 41/Hurfville Rd in Deptford Twp. 1 right lane of 2 lanes closed until 3:30 PM on July 25,2025.
-
As of 12:26pm, there's Construction on Inner Port Street in both directions between Corbin Street and Port Street in Newark. All lanes closed until September 2025.
-
As of 9:05am, there's Construction on Van Wyck Expressway northbound ramp to North Service Road in New York. All lanes closed until 11:59 PM on September 03,2025.
-
As of 8:59am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 38 - CR 536 in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 6:55am, there's Roadwork on the Atlantic City Expressway eastbound in the vicinity of Pleasantville Toll Plaza in Pleasantville. Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 4:01am, there's Construction on NJ 70 in both directions between East of Cropwell Rd in Evesham Twp and NJ 38 in Pennsauken Twp. All lanes shift until 11:00 P.M.on November 30th, 2025.
-
As of 4:01am, there's Construction on US 130 in both directions from CR 551 in Brooklawn to North of NJ 45 in Westville. All lanes shift until 11:59 PM on July 31, 2025.
-
As of 4:00am, there's Construction on NJ 47 in both directions from CR 551/Broadway Av to US 130 in Westville. 1 Right lane closed until 11:59 PM on December 31,2025.
-
As of 4:00am, there's Construction on NJ 70 westbound CR 539/CR 530/Whiting New Egypt Rd in Manchester Twp. 1 Right lane closed until 5:00 AM on October 10,2025.
-
As of 7:47am, there's Construction on the Atlantic City Expressway eastbound from East of Exit 7 - Garden State Pkwy in Egg Harbor Twp to West of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:43am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 14 - Leipzig Ave in Hamilton Twp. 1 Left lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:40am, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 5 - US 9 in Pleasantville. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 7:30am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Exit 41 - CR 689 - Berlin - Crosskeys Rd in Winslow Twp. Left shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 8:57am, there's Construction on Port Street eastbound ramp to Corbin Street in Newark. All lanes closed and detoured All EB Port St. access to SB Corbin St. to follow the posted Marlin St. detour until September 2025.
-
As of 6:08pm, there's Long term road construction on the New Jersey Turnpike - Eastern Spur southbound from South of Northern Mixing Bowl in Ridgefield to North of Interchange 17E - NJ 3/Lincoln Tunnel in Secaucus. 1 Right lane shift.
-
As of 10:18am, there's Construction on Corbin Street in both directions from Kellogg Street to Outer Port Street in Newark. 1 Right lane closed until September 2025.
-
As of 10:10am, there's Construction on the Atlantic City Expressway eastbound in the vicinity of Egg Harbor Toll Plaza in Hamilton Twp. Right shoulder closed MOVE OVER FOR HIGHWAY WORKERS.
-
As of 12:02pm, there's Construction on I-80 eastbound in the vicinity of Exit 56 - Squirrelwood Rd in Woodland Park. All lanes closed **Exit 56B Ramp only**, until 3:00 PM on November 18, 2025.
-
As of 12:37pm, there's Construction on the Atlantic City Expressway westbound in the vicinity of Exit 12A - US 40 - Wrangleboro Rd in Hamilton Twp. 1 Right lane and shoulder closed MOVE OVER FOR HIGHWAY WORKERS.